top of page
News & Insights
Learn more about all things modular data centers


Traditional Construction v. Volumetric Modular Data Center Manufacturing
Volumetric modular data center manufacturing turns the traditional construction project into a product – designed, assembled, tested, and quality-controlled in a factory environment before being delivered to the site.
23 minutes ago1 min read


The Rise of Volumetric Modular Data Center Construction & the Future of Infrastructure
The construction industry is bumping up against a wall that traditional delivery methods were never built to handle: the sheer velocity of AI data center demand.
Nov 45 min read


Build Both at Once: How Parallel Delivery Shortens the AI Infrastructure Deployment Schedule
Parallel AI infrastructure deployment splits the project into two workstreams that can progress independently before coming together for installation and final commissioning.
Oct 163 min read


Scalable AI Infrastructure Isn't a Feature. It's an Architecture Decision.
Every data center operator talks about scalable AI infrastructure. But scalability isn't simply about how much capacity a facility can ultimately support. It's about how quickly capacity can be added as compute demand changes.
Sep 143 min read


Not All Modular Data Centers Are Created Equal
Owners comparing "modular" data center options may be comparing approaches that differ enormously in schedule impact, quality control, and risk, without realizing it.
Aug 115 min read


Sustainable AI Infrastructure + Community: Why Digital Infrastructure Needs a New Approach and Why This Matters Now
Exploring how to build the sustainable AI infrastructure the future needs – minimizing the data center's impact on the environment and communities where it sits.
Jul 205 min read


From dirt to compute-ready in under 90 days
In June, Mod42 delivered what we believe is the fastest volumetric modular AI data hall deployment ever completed.
Jul 71 min read


A Modular Data Center Is Not a Container: Why Mod42 Manufactures Complete AI Data Centers
Dramatically speeding time to revenue is a achieved through manufacturing, not through containers.
Jun 173 min read


Boundary-free AI Infrastructure: A Conversation with DCD
In this Talk, Kat Sullivan speaks with Valerie Crafton of Mod42, to explore boundary free AI infrastructure and how modular delivery is reshaping speed to deployment across next generation data center builds. Key topics covered: How modular infrastructure is accelerating data center deployment timelines and reducing construction complexity. Where prefabrication is unlocking new flexibility across site selection, scalability, and delivery risk. Why standardized modular strateg
May 251 min read


Can Data Centers Be Built in Half the Time? Yes!
On today’s Dave Cooper LIVE, we explore the future of digital infrastructure with: Christopher Abramo — CEO & Founder of Mod42 and Valerie Crafton — SVP Strategy & Operations The global demand for AI and high-density computing is accelerating faster than traditional infrastructure can keep up. Building a data center the conventional way can take 24–36 months or longer, and by the time it’s complete, the technology may already be evolving. So what if we could build data center
May 251 min read
bottom of page

